December 8th Update

  Recently Completed work Retaining Walls The permanent retaining wall was installed in two phases, the cast-in-place headwalls that surround the tunnel and the pre-cast sections that flank both sides of the tunnel.  Once the walls were in place on both sides of the railroad, the space between the temporary sheeting and permanent walls was…